District's acceptance and approval of the "AS-BUILT" drawings are a necessary condition precedent to the release of the final retention. The Contractor shall verify that all changes in the work are included in the "AS- BUILT" drawings and deliver the complete set thereof to the Project Manager for review and approval within thirty (30) calendar days after District's notice of completion. Progress payments may be delayed or withheld until such time as the record set is brought up to date to the satisfaction of the Project Manager. EARTHWORK 1.1 GENERAL (Per Green Book) Unless otherwise approved, all pipeline trenches shall have vertical sides 1.2 1.3. All main runs, whether piping, conduit, duct work, drain lines, etc., shall be located in addition by dimension and elevation. WATER PIPELINE CONSTRUCTION SPECIFICATIONS (In addition to Green Book Standards) 1.

#Water pipeline as built drawing verification#

Deviations from the drawings shall be shown in detail. As-Built Survey means a survey prepared by a licensed Ohio surveyor based on information received from Co- Borrowers, project contractors, and public agencies, but need not be based upon a field verification or investigation of the improvements or grades, unless the surveyor is engaged to provide such field verification services. Actual locations to scale shall be identified on the drawings for all runs of mechanical and electrical work, including all site utilities installed underground, in walls, floors, and furred spaces, or otherwise concealed. Before we proceed to detailed algorithms, lets look at a generic text-processing pipeline depicted in Figure 9-1.

water pipeline as built drawing water pipeline as built drawing

As changes occur, there will be included or marked on this record set on a daily basis if necessary to keep them up to date at all times. In the AR Data Pipeline, documents are processed through several text analysis modules: harmonization (1), NLP and relation identification (2), labelling (3), to thereafter be packaged as enhanced. As-Built Drawings. The Contractor and all Subcontractors shall maintain on the work site a separate complete set of contract drawings which will be used solely for the purpose of recording changes made in any portion of the work during the course of construction, regardless of the reason for the change.







Water pipeline as built drawing